Smart Initiative

Fire & Rescue Department (JBPM) Emergency Response Time

JBPM Putrajaya emergency performance monitoring system — achieving an average 5-minute 50-second on-scene arrival time across 513 fire and rescue calls in 2025, surpassing the national NART standard

Operational Since 2019 Tahap 2 (Developing Smart City) → Tahap 3 (Leading Smart City)
Lead Agency
Jabatan Bomba dan Penyelamat Malaysia

Key Metrics
purata masa tindak balas 5 minit 50 saat
kadar respons dalam 10 minit 97.70%
jumlah panggilan 2025 513 panggilan

Rapid emergency response time is the difference between life and loss. The Fire & Rescue Department Malaysia (JBPM) WP Putrajaya has proven world-class operational efficiency with an average on-scene arrival time of 5 minutes 50 seconds — surpassing the nationally mandated National Average Response Time (NART) standard. This performance is achieved through integrated operational management between two strategic stations covering all 20 Putrajaya precincts.

Function & Operations

JBPM WP Putrajaya operates through two main stations equipped with trained personnel and internationally-standard modern equipment:

Station Category 2025 Calls Fire Rescue Special Duties
BBP Presint 7 A 360 52 307 1
BBP Presint 14 C 153 24 129 0
TOTAL 513 76 436 1

For 2025 (1 January – 31 December), JBPM WP Putrajaya handled 513 emergency calls encompassing fire operations, rescue, humanitarian services, and special duties. Operational outcomes recorded:

  • Fire: 11 saved (Presint 7) — zero fatalities and zero injuries in fire incidents
  • Rescue: 1 fatality, 25 injured, 145 saved — managed with optimum response time
  • Estimated losses: RM 1,343,970 — compared to RM 12,510,245 in assets saved
  • False calls: 0 — both stations recorded zero false calls throughout the year

Case distribution by precinct shows Presint 9 (~79 cases) and Presint 11 (~73 cases) as areas with the highest response demand, particularly for rescue operations — reflecting the need for data-driven resource allocation.

System Architecture

JBPM WP Putrajaya’s response efficiency is supported by an integrated emergency management technology ecosystem:

NART Performance Reporting System: Response time data is collected and analysed for every call — covering time of call receipt, unit dispatch time, on-scene arrival time, and operation completion time. Average response time analysis reports are submitted to PLANMalaysia as the MS ISO 37122 (IND-60) indicator and reviewed periodically for continuous improvement.

Public Impact

JBPM WP Putrajaya’s performance of 97.70% response within 10 minutes provides robust safety assurance to 125,200 Putrajaya residents (DOSM 2025) as well as hundreds of thousands of federal public sector workers and annual visitors. The average 5 minutes 50 seconds achievement — far exceeding the national NART standard — is testament to the maturity of Putrajaya’s fire and rescue operational system. The RM 12.51 million in assets saved throughout 2025 reflects the direct economic impact of rapid response in protecting private property, public assets, and federal infrastructure from destruction through fire and disaster.

Average Response Time 5 Minutes 50 Seconds: JBPM WP Putrajaya achieves average on-scene arrival of 5:50 minutes for 434 fire and rescue calls — exceeding the national National Average Response Time (NART) standard
97.70% of Responses Within 10 Minutes: Nearly all emergency calls are handled within the 10-minute threshold from initial call receipt
513 Emergency Calls in 2025: Handled by two stations — BBP Presint 7 (360 calls) and BBP Presint 14 (153 calls) across all 20 Putrajaya precincts
RM 12.51 Million in Assets Saved: Value of property successfully saved through fire and rescue operations throughout 2025
Zero False Calls: Both stations recorded 0 false calls throughout the 2025 assessment year
436 Rescue Operations: Majority of calls are rescue operations (KK) vs fires (KEB) — reflecting JBPM's expanded role beyond fire suppression alone
Emergency Management & Response Time Monitoring System (JBPM) Command & Control Centre (PCC) — CAD (Computer Aided Dispatch) GPS Vehicle Tracking System for Fire Engines Station Operational Performance Reporting Application NART (National Average Response Time) Data Integration System

Initiative Details

Status Operational
Year Launched 2019
Domain
Rating Tier Tahap 2 (Developing Smart City) → Tahap 3 (Leading Smart City)
Lead Agency
Jabatan Bomba dan Penyelamat Malaysia

Impact Metrics

purata masa tindak balas 5 minit 50 saat
kadar respons dalam 10 minit 97.70%
jumlah panggilan 2025 513 panggilan
aset diselamatkan RM 12.51 juta
operasi penyelamatan 436 kes
panggilan palsu 0

Strategic Alignment

Putrajaya Smart City Blueprint
Thrust 5: Smart Safety & Security
Malaysia Smart City Framework
Smart Living (Public Safety & Emergency Management)
MS ISO/IEC 37122 Indicator
UN Sustainable Development Goals
SDG 11 SDG 3 SDG 16
All Initiatives